© 2024 EasyEDA Some rights reserved ISO/IEC
1.Easy to use and quick to get started
2.The process supports design scales of 300 devices or 1000 pads
3.Supports simple circuit simulation
4.For students, teachers, creators
1.Brand new interactions and interfaces
2.Smooth support for design sizes of over 5,000 devices or 10,000 pads
3.More rigorous design constraints, more standardized processes
4.For enterprises, more professional users
STD Generator Transfer Switch 220V - 380V
License: GPL 3.0
Mode: Editors' pick
ID | Name | Designator | Quantity |
---|---|---|---|
1 | 3 phase 380V | U4 | 1 |
2 | 3 phase | U5 | 1 |
3 | Compressor | U10 | 1 |
4 | Manual Transfer Switch | U3 | 1 |
5 | VFD | QM1 | 1 |
6 | 3 Phase monitor relay | GRV8-03_M460 | 1 |
7 | Automatic transfer switch | W2R-3P | 1 |
8 | Generator | I1 | 1 |
9 | 220V -> 380V | T1 | 1 |
10 | SW_SPDT | SW1,SW2,SW3 | 3 |
11 | Solar 1 | SC3 | 1 |
12 | Solar 2 | SC4 | 1 |
13 | SLIDE SWITCH 2P | SW4 | 1 |
14 | 3 phase+N 380V | U4 | 1 |
15 | 0.2u | C1 | 1 |
16 | Output A(R) (House) | CON1 | 1 |
17 | Output N(R) (House) | CON2 | 1 |
18 | V,A solar meter | CON3 | 1 |
19 | +3.3V | CON4 | 1 |
20 | to timer trigger | CON5 | 1 |
21 | GND | CON6 | 1 |
22 | PWM out | CON7 | 1 |
23 | LOAD | CON8,CON9 | 2 |
24 | EL817C | U2 | 1 |
25 | DC | R1,R2,R3 | 3 |
26 | Auto Transfer Switch | U3 | 1 |
27 | CH-57-Z-T | L1 | 1 |
28 | 3 Phase-3W monitor relay | GRV8-03_M460 | 1 |
29 | MBRF20200CT | D1,D2 | 2 |
30 | 75k | R4 | 1 |
31 | 15k | R5 | 1 |
32 | Auto transfer switch | W2R-3P | 1 |
33 | 1N4007 | D3,D4 | 2 |
34 | Manual start generator | S1 | 1 |
35 | Auto start (HP) | S2 | 1 |
36 | bypass | S4,S5 | 2 |
37 | LiFePO4 | U1 | 1 |
38 | bypass | SW5 | 1 |
39 | MOC3023 | U8 | 1 |
40 | CONTACTOR 1NO | P1 | 1 |
Unfold
Loading...
Do you need to add this project to the album?