Just sent in order for five blue pcbs from my design. Specified Fedex. The message mentioned a DRC , etc. I have already checked circuitry, downloaded my files, etc. Just wondering, how soon I can get these paid for, and how soon I can get the boards? This is a design for a GREAT customer which next order is 12 prototypes, soI want to pop these in my smt oven --quick-- and send them out ! Let me know if I can pay more to expedite these 5 boards so that 1 can get them in ~1 - 1.5 weeks max. That is, unless they'll already ship to me in that time frame based on my Fedex shipping request. The sooner I get these , the better. Thanks!